What you’ll need
Tools
- Hole saw
- Drill/driverDEWALT 20V MAX Cordless Drill and Impact Driver Combo KitView on Amazon
- Drill bit for pilot holes
- Saw for cutting parts to lengthDEWALT 20V MAX 6-1/2" Circular Saw (Tool Only)View on Amazon
- Tape measureSTANLEY FATMAX Tape Measure, 25-FootView on Amazon
- SquareSWANSON 7" Speed SquareView on Amazon
- Pencil
- Eye protectionDEWALT Dominator Safety Glasses, ANSI Z87.1+, Clear Lens, Black FrameView on Amazon
Materials and supplies
- 3/4 plywood, furniture-grade birch for 6 parts
- 24 × #8 × 1 1/2" flat-head wood screwsHillman 41688 Flat Head Square Drive Wood Screw, 8 x 1-1/2-Inch, 50-PackView on Amazon
- 1.4 fl oz Interior wood glueTitebond Original Wood Glue 5062, 4 ozView on Amazon
- 2 × 150-grit sandpaper, 9" × 11"3M Pro Grade Precision Faster Sanding Sheets, 150 Grit, 11 x 9 in (20 Pack)View on Amazon
- 2 × 220-grit sandpaper, 9" × 11"3M Pro Grade Precision Faster Sanding Sheets, 220 Grit, 11 x 9 in (20 Pack)View on Amazon
- 5.1 fl oz Clear indoor furniture finishMinwax 233334444 Polycrylic Protective Wood Finish, Clear Satin, ½ PintView on Amazon
As an Amazon Associate I earn from qualifying purchases. Amazon links go to amazon.com, the US store.
Cut list
| Part | Qty | Size |
|---|---|---|
| Top | 1 | 12" × 12" × 3/4" |
| Left side | 1 | 10 1/2" × 23 1/4" × 3/4" |
| Right side | 1 | 10 1/2" × 23 1/4" × 3/4" |
| Rear apron | 1 | 9" × 8" × 3/4" |
| Lower shelf | 1 | 9" × 10 1/2" × 3/4" |
| Middle shelf | 1 | 9" × 10 1/2" × 3/4" |
Step by step
Prepare the cable opening
Bore the cable opening and smooth the cut parts before assembly.
- Mark the hole center 6" from either side and 2 1/2" from the rear edge.
- Clamp the top over a sacrificial backing board on a stable bench.
- Bore the 1 1/2" cable opening with a drill and hole saw.
- Sand the opening, exposed edges and faces with 150-grit abrasive.
Attach the rear apron
Join the side panels to the rear apron to make a square, braced frame.
- Apply a thin glue film to both apron ends.
- Clamp the apron between the sides with their tops and rear edges flush.
- Check the 9" clear distance between the side panels.
- Drill clearance holes, shallow countersinks and pilot holes at the screw marks.
- Drive 2 screws through each side into the apron.
Attach the lower shelf
Fit the lower shelf between the sides to tie the base together.
- Mark the shelf underside 3" above both side panel bottoms.
- Apply a thin glue film to both shelf ends.
- Clamp the shelf between the marks with its front and rear edges flush.
- Drill clearance holes, shallow countersinks and pilot holes at the screw marks.
- Drive 3 screws through each side into the shelf.
Attach the additional shelf
Fasten the additional shelf between the sides above the existing lower shelf.
- Mark the additional shelf underside 11" above both side panel bottoms.
- Apply a thin glue film to both shelf ends.
- Clamp the shelf at the marks with its front and rear edges flush with the sides.
- Drill clearance holes, shallow countersinks and pilot holes at the screw marks.
- Drive 3 screws through each side into the additional shelf.
Attach the charging top
Center the top over the frame and screw it to both sides and the apron.
- Apply a thin glue film to the upper edges of the frame.
- Clamp the top with a 3/4" overhang on all four edges.
- Drill clearance holes, shallow countersinks and pilot holes at the screw marks.
- Drive 3 screws into each side and 2 into the rear apron.
- Wipe away squeezed-out glue with a damp cloth.
Finish the table
Smooth the assembled table and protect its exposed wood with an indoor finish.
- Allow the glue to cure for its labeled time.
- Sand the exposed wood lightly with 220-grit abrasive.
- Remove sanding dust with a clean cloth.
- Apply a clear indoor finish according to its label.
- Allow the finish to cure fully before use.
Set up the charging station
Check the table on a level indoor floor and route charging cables through the top.
- Place the table on a level indoor floor beside the intended outlet.
- Check for rocking with gentle pressure at each corner.
- Route charging cables through the rear opening.
- Arrange chargers with ventilation space around them.
- Leave slack in the cables to prevent pulling on the table.
Questions
How many steps does it take to build a charging table, 24" high × 12" wide?
The plan has 7 steps and 6 parts. How long it takes depends on your tools and experience.
What tools do I need?
Hole saw, drill/driver, drill bit for pilot holes, saw for cutting parts to length, tape measure, square, pencil and eye protection.
What materials do I need?
3/4 plywood, furniture-grade birch, #8 × 1 1/2" flat-head wood screws, Interior wood glue, 150-grit sandpaper, 9" × 11", 220-grit sandpaper, 9" × 11" and Clear indoor furniture finish.
How big is it?
As designed: width 12", height 24" and length 12".
Can I change the dimensions?
Yes. Tap “Make one for my space” to open this design in Fixie, and Fixie designs a version for your space, tools and needs, with its own cut list, materials and steps. Your first design is free.
This design was generated with AI and has not been checked by a person. Review measurements, materials and instructions before building, and follow the safety guidance for your tools.